Coming Soon
in August 2011
NEW
G4
Colo Center
at 77 Sundial Avenue, Manchester, New Hampshire
3,5
Million dollar, 14,000 sq feet facility.
Power Backup:
- Caterpillar Model 3512B diesel generator with output capacity of 1500kw at 3000 AMPS.
- ASCO 7000 Series Automatic Transfer Switch.
- 2 x MGE UPS 6000, 500kVA Backup UPS System.
Cooling:
- Self-contained TRANE Air Conditioning unit model SAUC-IOM-1. Provides fresh air input to entire facility and supplemental heating/cooling to office, storage
and reception areas.
- 2 x Bell and Gossett Series 1510 Universal centrifugal pumps which provide redundant cooled glycol to each CRAC Liebert Air Conditioning Unit within data
center facility.
- 7 x 20-Ton Liebert air conditioning units with built in smoke and water detection alarms and 3 more for future expansion.
Multiple
10G IP Packet connectivity and OC48 Sonet Switched network,
in
addition to ATT, Fairpoint, Neon, and Verizon Business (MCI) networks.
Optional direct connectivity to Markley 1 Summer Carrier Hotel in Boston.
Class 4/5 Voice Switch connectivity options for easy tandem and end office switching options for PRI and other telephony delivery at
site.
www.G4communications.com